Phase 4: Oathsworn Hall (Completion)
Activating the property's "Nexus." Completing the interiors of the Manor House, commissioning the Creative Studios, and carving the Amphitheatre into the landscape.
Total Phase Capital
$5,250,000
Systems, Interiors, & Venue.
Key Method
Landscape Acoustics
Natural sound amplification.
Key Asset
The Amphitheatre
500-Seat Natural Venue.
Detailed Execution Process
Methodology for systems integration and cultural assets.
The Amphitheatre
Cultural Anchor
$450,000
- Terraforming: Utilizing the Estate Fleet (Excavators) to carve the seating bowl directly into the natural slope behind the Sound Lab, minimizing concrete use and maximizing natural acoustics.
- The "Studio Link": Installing underground fiber-optic and XLR conduit connecting the Stage directly to the Sound Lab's control room. This allows us to offer professional "Live Recording" packages for performers.
- Materiality: Seating tiers constructed from large native stone blocks (sourced regionally), creating a venue that feels ancient and indestructible.
Creative Studios (The Guild)
Maker Equipment
$1,450,000
- Sound & Music Lab: A "Room-within-a-Room" floating isolation booth for professional tracking, serving as the nerve center for the Amphitheatre.
- Metal Atelier & Wood Shop: High-voltage drops installed for industrial welding and milling equipment.
- Ceramics Studio: Dedicated ventilation for kiln firing.
Manor Interiors & Millwork
Interior Craft
$1,750,000
- Provenance-Based Procurement: Sourcing architectural salvage (antique heart pine, industrial fixtures) to embed history into the walls of Oathsworn Hall.
- Bespoke Joinery: Hand-carved details and visible timber joinery executed by our Resident Artisans.
Advanced MEP Integration
Systemic Intelligence
$1,600,000
- Passive-Thermal Zoning: Utilizing geothermal radiant flooring zoned specifically for different activity levels.
- Smart-Grid Balancing: Integrating load-shedding software to manage the studio's power draw.
Total Phase 4 Deployment
$5,250,000