Workforce & Housing Plan

The strategy for a Zero-Turnover ecosystem. Fair wages and flexible, dignified housing based on human needs, not job titles.

Service Ratio

1:1.5

Staff to Guest Ratio (High Touch).

Total Units

35 Guest / 18 Staff

Balanced ecosystem capacity.

Staff Count

~28 FTE

Plus On-Call DSP Support.

The Labor Stack

Operational Roles & Flexible Housing Options

Role / Dept Count Base Pay
Leadership (GM/Chef) 2 $85k - $95k+
Guild Masters (Artisans) 4 $60k+
DSPs (Direct Support) 4-6 $30/hr+
Ops & Hospitality 12 $25/hr
Grounds & Agriculture 6 $25/hr
TOTAL FTE ~28 Includes DSP Coverage

Housing Philosophy

The Honeycomb Cluster

We arrange our Guild Halls in a hexagonal "Honeycomb" formation. This biomimetic layout maximizes shared community space in the center while directing private views outward to nature. It creates a grounded, balanced environment that works with the landscape, not against it.

The DSP Role

Direct Support Professionals act as "Personal Concierges" or friends-in-residence. They operate under strict NDA and HIPAA compliance. Their housing can be integrated near guests for on-call support or separate for downtime.

3x Guild Halls (The Honeycomb)

24 Beds • Hexagonal Cluster

Three distinct halls (8 suites each) arranged in a hexagonal pattern. Maximizes connection and privacy.
Phase 2 Expansion: 3 additional hexagonal halls for local affordable housing stock.

Family Cottages

2-3 Bed Units

Private residences for staff with children, partners, or specific space needs. Allocated based on family size and availability.

Ag-Outpost

Seasonal • 6 Beds

Short-term housing for seasonal farm apprentices and summer support crew.

Phased Rollout

Phase 1: Foundation (Months 1-6)

Secure temporary housing (RVs/Airstreams) for construction crew. Begin construction of Guild Hall A (The First Hexagon).

  • • Hire: Project Manager, Lead Carpenter
  • • Build: Utility hookups for staff zone

Phase 2: Activation (Months 6-12)

Completion of the Staff Honeycomb (3 Halls). Hiring of core operational team (GM, Chef, DSPs). They move in 2 months pre-opening.

  • • Hire: GM, Chef, 4 Artisans, 2 DSPs
  • • Build: First 3 Family Cottages

Phase 3: Stabilization & Community (Year 2)

Expansion of housing stock. Constructing the second Honeycomb Cluster (3 Halls) dedicated to local affordable housing.